See the risk before the next project review.

Connect fee, labor, scope and schedule information so project owners see changes as they happen, and reviews stop starting with a round of spreadsheet work.

SHEET J01 / PROJECTSExample

Fee and labor signal

  • 92%of fee

    Construction documents phase

  • 61%of fee

    Design development phase

  • Owner to review

    Scope change

  • On plan

    Schedule

Signals link back to the records behind them.

The problem

Problems show up at the review.

  1. Fee, hours and scope sit in different tools, so nobody sees them together.

    Different tools
  2. Margin problems surface after they have already happened.

    After the fact
  3. Preparing a project review means pulling numbers from several tools by hand.

    By hand

What we build

What we build for project teams

Fee and labor tracking

Bring fee, labor and billing together by project and phase.

Scope change flags

Surface changes for the project owner as they appear, not at month end.

Schedule signals

Show where dates and effort are drifting apart.

Review packs

Assemble the numbers for a project review automatically, ready for a person to read.

How it works

Three steps, with a person at the end.

  1. Connect

    Link the agreed fee, labor, scope and schedule sources.

  2. Watch

    Track the measures your leaders have agreed matter.

  3. Act

    Send the right signal to the right project owner while there is still time.

People stay accountable

Review, control and recovery are part of the design.

Project owners and principals make the call. The system makes sure they see it early.

The intended benefitEarlier visibility into issues, and less effort assembling project reviews.

  • Every signal links back to the record behind it.
  • Access agreed before anything is built.
  • Project owners review what is flagged before anything changes.
  • A recovery plan for when something does not go as expected.